Energy engineering
Range of services:
- Steam and condensate piping systems
- Turbine piping / live steam piping
- Pressure boosting stations
- Coolant and oil systems
- Glass fiber reinforced plastic (GRP) piping for coolant and for flue gas desulphurization (FGD)
References
- Turbine piping in power plants Cikarang and Delimara
- KTA‐design of pipe systems and support structures for project Ignalina
- Start-up station turbine 1 in the PCK power plant in Schwedt
- Steam and condensate lines for the biomass power station in Eberswalde
- District heating pressure maintenance at the combined heat and power (CHP) plant in Chemnitz
- Coolant lines for the DOW power station in Stade and for the CHP plant in Chemnitz
- Piping for the steam turbine in Bad Elster
![](https://en.cpg-engineering.com/wp-content/uploads/sites/2/2013/12/dampfturbine_bad_elster-480x360.jpg)
![](https://en.cpg-engineering.com/wp-content/uploads/sites/2/2013/11/heizkraftwerk-chemnitz-2-480x360.jpg)
![](https://en.cpg-engineering.com/wp-content/uploads/sites/2/2013/11/hkw-chemnitz-4-480x360.jpg)
![](https://en.cpg-engineering.com/wp-content/uploads/sites/2/2013/11/hkw-chemnitz-480x360.jpg)
![](https://en.cpg-engineering.com/wp-content/uploads/sites/2/2013/11/hkw-chemnitz-2-480x360.jpg)
![](https://en.cpg-engineering.com/wp-content/uploads/sites/2/2013/11/hkw-chemnitz-3-480x360.jpg)
![](https://en.cpg-engineering.com/wp-content/uploads/sites/2/2013/11/hkw-chemnitz-5-360x480.jpg)
![](https://en.cpg-engineering.com/wp-content/uploads/sites/2/2013/11/hkw-chemnitz-6-360x480.jpg)
![](https://en.cpg-engineering.com/wp-content/uploads/sites/2/2013/11/hkw-chemnitz-7-360x480.jpg)
![](https://en.cpg-engineering.com/wp-content/uploads/sites/2/2013/12/hkw-chemnitz-verdichterver--480x360.jpg)
![](https://en.cpg-engineering.com/wp-content/uploads/sites/2/2013/12/hkw-chemnitz-verdichterverr-480x360.jpg)
![Holzkraftwerk Eberswalde](https://en.cpg-engineering.com/wp-content/uploads/sites/2/2013/12/Holzkraftwerk-Eberswalde.jpg)